
Add to Cart
Custom Metal Product Stainless / Carbon Steel Casting Precision Casting
Product Description
Material | Cast Steel |
Casting Process | Precision Casting |
Inspections | Based on finished drawings |
Minimum Order Quality | 100Pcs |
Tooling & Samples | about 30days after getting order |
Payment Terms |
of mold: 50% advance payment, 50% after sample approval. of mass production: 50% advance payment, 50% before delivery |
Foundry Overview
▪ Good quality with direct factory price;
▪ OEM / ODM Service;
▪ Customized size and specification as per your drawing or sample;
▪ Quotation will be offered within 72 hours;
▪ Flexible lead time& efficient shipment;
▪ Advanced Production & Measurement equipment;
▪ Files Available: 2D (.dxf / .dwg / .pdf ) and 3D (.igs / .stp / .x_t )
We focus on the production of metal casting products. The existing production equipment includes aluminum alloy die-casting machine, grinding and polishing machine, drilling and tapping machine, vibrating machine, CNC lathe, etc., providing "mold design---mould making---casting production --- Post-processing surface treatment" one-stop service.
We are the source manufacturer, which can effectively control costs and strictly control quality and delivery.
Our casting products are widely used in various industries, such as: electrical accessories, industrial machinery parts, automobile and motorcycle parts, etc.
Requesting a Quote
1. Customers send drawings or samples for quotation, such as 2D drawing (.dwg / .pdf) and 3D drawing (.igs / .stp), and provides information such as material, weight and required quantity.
2. Engineers carefully check the drawings to provide a specific manufacturing plan. The quotation will include mold cost, product manufacturing price, packaging and shipping costs.
3. After the two parties have no objection to the price, the customer places an order and signs the contract.
4. After the advance payment, the mold and sample are produced.
5. The customer confirms the sample;
6. After the sample is confirmed, mass production is started.
7. After the finished product is produced, it will be packaged and transported after testing.